Hospitality
ITC One Colombo One Project
Location: Colombo, Sri Lanka
Client: ITC Hotels
Operations: Larsen &Toubro Construction Limited
Architect: Surath Wickramasinghe Associates
Timber Engineer: Sterling
Structural System: Steel frame with LVL wall, floor and roof panels
Sector: Hospitality
Scope: Design, supply, Installation, testing and commissioning of glulam timber structures works
Completion: 2023
CFA:
Mass Engineered Timber: m3
Katara Hills VIP Camp
Location: QATAR (KATARA HILLS)
Client: UCC
Operations: Estithmar Ventures
Architect: Highness Engineering Consultants, Qatar
Timber Engineer: ACETRA, Serbia
Structural System: Steel frame with LVL wall, floor and roof panels
Sector: Hospitality
Scope: Design, supply, and installation
Completion: 05/11/2022
CFA: 480 m2 (9 – 1BD & 5 – 2BD)
Mass Engineered Timber: LVL – 757.92 m3 + thermo treated pine cladding – 112 m3V
Dutch Docklands Maldives
Location: Maldives
Client: Dutch Docklands
Architect: Dutch Docklands
Main Contractor & ID Works: Bison Maldives Pvt Ltd
Timber Engineer: S&J Engineering Services
Structural System: MET Steel Hybrid
V2 Structural System with Nichi Cladding
Sector: Hospitality
Scope: Design, supply, supervision and installation of 1 no floating house mock up (Office, exhibition house and Research Center)
Completion: 2022
CFA: 327.84 m2
Mass Engineered Timber: LVL 26.7 CBM / 20880 kgs
Steel tonnes: 1855.35 kgs
Skyspace Amarta by James Turell
Location: Fari Islands, Maldives
Client: Residency Hotels
Concept Architect: MK 27 Architects, Brazil
Concept Engineering: Hermann Blumer, Germany
Structural System: MET Steel Hybrid
Sector: Hospitality
Detail design engineering, manufacture and build: Venturer, Singapore
Completion: 2020
CFA:
Mass Engineered Timber:
Ritz Carlton
Location: Fari Islands, Maldives
Client: Pontiac Land, Singapore
Architect: Kerry Hil, Singapore
Timber Specialist: Venturer Pte Ltd
Engineer: Ronnie and Koh Consultants
Structural System: MET Steel Hybrid
Sector: Hospitality
Scope: Design, supply and build externally compete envelops to all villas and key elements to all villas and front house
Completion: 2020
CFA: 25km2
Mass Engineered Timber: 3000m3
Steel tonnes: 250
Time of Install: 14 Months
Amanpuri Retail Pavilion
Location: Phuket, Thailand
Main Contractor: Terra Group Ltd
Timber Specialist: Venturer Pte Ltd
Client: Aman Hotels
Architect: Kengo Kuma Architects and Associates
Engineer: Arup/ Studio Oktoplus Singapore
Structural System: Steel Hybrid, Glulam and CLT
Sector: Hospitality
Scope: Design, supply, and build main superstructure
Completion: 2019
CFA: 348 m2
Mass Engineered Timber: 35m3
Steel tonnes: 18
Time of Installation: 4 weeks
St Regis Resort
Location: Vommuli, Maldives
Client: Residency Hotels
Timer Specialist: Venturer Pte Ltd
Architect: Warner Wong (WOW) Singapore
Timber Engineer: Timber Concepts Gmbh/ Ronnie and Koh Consultants Singapore
Structural System: MET Steel Hybrid
Sector: Hospitality
Scope: Design and install key front of houses structures
Completion: 2015
CFA: 3400 m2
Mass Engineered Timber: 450m3
Steel tonnes: 80
Villa Marie
Location: St Barth’s, Caribbean
Client: Sibuet Hotels
Timer Specialist: Venturer Pte Ltd
Timber Engineer: Timber Concepts Gmbh
Structural System: Mixed, Mass Timber
Sector: Hospitality Hotel Extension
Scope: Shell and Core on 6 CLT and Glulam amenity buildings
Completion: 2016
Ocean Cay Marine Reserve
Location: The Bahamas
Client: MSC Cruises
Main Contractor: Bouygues Batiment International
Timer Specialist: Venturer Pte Ltd
Engineer: Synergie Bois (FR)
Structural System: Mixed Mass Timber
Sector: Hospitality
Scope: Shell and core on 100+ CLT and glulam amenity buildings
Completion: 2019
Mass Timber: 1173m3
103 buildings across 23 types